HOME             ABOUT US             OUR BLOG             AWARDS             GALLERY             VIRTUAL TOURS             TESTIMONIALS             CONTACT US

Updates on Wonder

July 26, 2012

admin @ 5:02 pm

The exterior is now complete, including guttering.  Our interior trim is now being installed, and our interior paint will be next.  We will have pictures of the trim work in about week.  We have also found the basment floor drains to be defective, and have cut the concrete basment floor, installed new floor drains, and under ground piping.  We just need to re-install the concrete, and paint the floor.  Look for more pictures and updates soon!

Filed under: General